Title: Which of the following procedures would be used to check the parallel loading feature on a counter? ... Post by: Coco on Jan 23, 2018 Which of the following procedures would be used to check the parallel loading feature on a counter?
A) Apply LOWs to the parallel DATA inputs, pulse the CLK input and check for LOWs on all the Q outputs. B) Apply HIGHs to all the Q terminals, pulse the CLK and check to see if the DATA terminals now match the Q outputs. C) Preset the LOAD inputs, set the CLR to its active level and check to see that the Q outputs match the values preset into the LOAD inputs. D) Apply HIGHs to all the DATA inputs, pulse the CLK and CLR inputs, and check to be sure that the Q outputs are all LOW. Title: Which of the following procedures would be used to check the parallel loading feature on a counter? ... Post by: zxcvbn on Jan 23, 2018 Content hidden
|