Biology Forums - Study Force

Science-Related Homework Help Electrical Engineering Topic started by: neonfayt on Jan 23, 2018



Title: The transient response time for a control system is the length of time between the start of the rise ...
Post by: neonfayt on Jan 23, 2018
The transient response time for a control system is the length of time between the start of the rise or fall in the process variable and the point where it reaches the maximum change.
 
  Indicate whether the statement is true or false


Title: The transient response time for a control system is the length of time between the start of the rise ...
Post by: icysparkles on Jan 23, 2018
FALSE