Title: Before the final version of a prospectus is approved by the SEC, the document is called a(n): Post by: kylieaglee on Jan 27, 2018 Before the final version of a prospectus is approved by the SEC, the document is called a(n):
a. shadow prospectus b. preliminary prospectus c. initial prospectus d. ghost document e. none of the other choices are correct Title: Before the final version of a prospectus is approved by the SEC, the document is called a(n): Post by: ccopp on Jan 27, 2018 e
|