Title: Using the periodic review system the target level is: Post by: Micky5490! on Jan 30, 2018 Using the periodic review system the target level is:
A) forecast demand during the review period. B) forecast demand during lead time. C) the sum of A and B. D) the sum of A and B plus the safety stock. E) none of the above Title: Using the periodic review system the target level is: Post by: taniaaaaaa on Jan 30, 2018 Content hidden
|