Title: Pre-control should only be used when process capability is no greater than 88 percent of the ... Post by: banoshaher on Jan 31, 2018 Pre-control should only be used when process capability is no greater than 88 percent of the tolerance.
a. True b. False Indicate whether the statement is true or false Title: Pre-control should only be used when process capability is no greater than 88 percent of the ... Post by: npalmieri on Jan 31, 2018 Content hidden
|