Biology Forums - Study Force

Other Fields Homework Help Trades and Apprenticeship Topic started by: shabazz627 on Feb 9, 2018



Title: In a structure fire, what part of the flow path is an open doorway?
Post by: shabazz627 on Feb 9, 2018
In a structure fire, what part of the flow path is an open doorway?
 
  A. Inlet vent
  B. Outlet vent
  C. Lower vent
  D. Upper vent


Title: In a structure fire, what part of the flow path is an open doorway?
Post by: nicoled79 on Feb 9, 2018
A