Biology Forums - Study Force

Other Fields Homework Help Trades and Apprenticeship Topic started by: 2goodgabe on Feb 23, 2018



Title: When a form panel is lifted into place by a crane, it is said to be _____.
Post by: 2goodgabe on Feb 23, 2018
When a form panel is lifted into place by a crane, it is said to be _____.
 
  a. hoisted
  b. flown in
  c. tilted up
  d. slipped in



[Ques. 2] To aid in erection of the forms by crane, carpenters install _____.
 
  a. lifting eyes
  b. turnbuckles
  c. eyebolts
  d. hoisting hooks



[Ques. 3] To prepare for construction, formwork must be properly _____.
 
  a. inventoried
  b. staged
  c. located
  d. stored



[Ques. 4] Wood or steel frames installed between inner and outer wall forms to create window or door openings are
  called _____.
 
  a. spacers
  b. holdouts
  c. bucks
  d. lintels



[Ques. 5] When calculating drywall requirements, find the needed number of 4'-6  8' panels by dividing the square
  footage by _____.
 
  a. 24
  b. 30
  c. 32
  d. 36


Title: When a form panel is lifted into place by a crane, it is said to be _____.
Post by: mayyyy on Feb 23, 2018
Content hidden


Title: When a form panel is lifted into place by a crane, it is said to be _____.
Post by: 2goodgabe on Feb 23, 2018
Thank you for helping me throughout this difficult semester