Title: ________ is a process in which stakeholders identify the features that a project will need and then ...
Post by: nmar on Mar 15, 2018
________ is a process in which stakeholders identify the features that a project will need and then prioritize them as mandatory, preferred, or nonessential.
 
  A) Requirements analysis
  B) Informative modeling
  C) Acceptance testing
  D) Feasibility study

 Q. 2

Which of the following is most closely associated with sustaining technologies?
 
  A) improvements that streamline existing processes
  B) radical breakthrough that replaces low-end products
  C) potential to reshape and reform an industry
  D) association with new product or service, led by technology

 Q. 3

A number used to encrypt data is called a(n) ________.
 
  A) signature
  B) key
  C) cookie
  D) escrow

 Q. 4

E-marketing information systems provide extensive tracking capabilities by embedding in the HTML email a ________.
 
  A) web trojan
  B) web beacon
  C) server log
  D) web log

 Q. 5

Structured information can be defined as data ________.
 
  A) that can be organized into hierarchies
  B) that cannot be linked together
  C) about data that clarifies the nature of the information
  D) that is difficult to break down

 Q. 6

To balance the information needs of multiple stakeholders, top-level managers need clear, consistent, and accurate reports that summarize information from across the enterprise.
 
  Indicate whether the statement is true or false

 Q. 7

Which of the following illustrates a sustaining technology?
 
  A) Digital cameras replaced cameras that required film.
  B) Digital music sold over the Internet disallowed simultaneous downloads.
  C) LCD monitors were introduced to replace analog monitors.
  D) Car manufacturers invented airbags to improve safety of passengers.


Title: ________ is a process in which stakeholders identify the features that a project will need and then ...
Post by: jmbt96 on Mar 15, 2018
Ans. to #1

A

Ans. to #2

A

Ans. to #3

B

Ans. to #4

B

Ans. to #5

A

Ans. to #6

TRUE

Ans. to #7

D


Title: ________ is a process in which stakeholders identify the features that a project will need and then ...
Post by: nmar on Mar 15, 2018
Commenting just to show my support for informative posts like this, keep it up 10/10


Title: ________ is a process in which stakeholders identify the features that a project will need and then ...
Post by: jmbt96 on Mar 15, 2018
That helps more than you thinks, thanks for being so thoughtful