Title: Demolition debris from a construction site _____. Post by: Liomustafa on Mar 16, 2018 Demolition debris from a construction site _____.
a. can be used for fill in the construction area b. should be recycled if possible c. must be sent to the landfill d. should be burned daily Q. 2 The first response to a fire is to _____. a. lower the load b. secure the crane c. cease crane operation d. extinguish the fire Q. 3 When lifting loose materials such as pipe or bar stock, use a _____. a. chain and hook b. double-wrap choker hitch c. beam clamp d. hook in the banding Title: Demolition debris from a construction site _____. Post by: grubbingrouch on Mar 16, 2018 Content hidden
|