Title: Demolition debris from a construction site _____.
Post by: Liomustafa on Mar 16, 2018
Demolition debris from a construction site _____.
 
  a. can be used for fill in the construction area
  b. should be recycled if possible
  c. must be sent to the landfill
  d. should be burned daily

 Q. 2

The first response to a fire is to _____.
 
  a. lower the load
  b. secure the crane
  c. cease crane operation
  d. extinguish the fire

 Q. 3

When lifting loose materials such as pipe or bar stock, use a _____.
 
  a. chain and hook
  b. double-wrap choker hitch
  c. beam clamp
  d. hook in the banding