Title: After hardening, tempering should be done: Post by: Preet on Mar 17, 2018 After hardening, tempering should be done:
A) Whenever time permits B) Within 24 hours C) Immediately D) If one feels it is needed for a particular job Q. 2 On a 50 division inch vernier height gage, the beam scale reads 7.500 and the vernier is coincident at the first mark past the zero index. The total reading would be: A) 7.500 B) 7.499 C) 7.501 D) 7.255 Title: After hardening, tempering should be done: Post by: Ron.M on Mar 17, 2018 C C Title: After hardening, tempering should be done: Post by: Preet on Mar 17, 2018 TYVM
Title: After hardening, tempering should be done: Post by: Ron.M on Mar 17, 2018 no worries, happy to help out
|