Title: Under the revised ABC system, the activity-cost driver rate for the supervision activity is ________. Post by: vsisto on Jul 1, 2018 Under the revised ABC system, the activity-cost driver rate for the supervision activity is ________.
A) $2.58 B) $2.40 C) $2.24 D) $1.16 Title: Under the revised ABC system, the activity-cost driver rate for the supervision activity is ________. Post by: hfchfch on Jul 1, 2018 Content hidden
Title: Under the revised ABC system, the activity-cost driver rate for the supervision activity is ________. Post by: vsisto on Jul 1, 2018 Just confirmed the same answer from my friend, thanks
|