Title: One of the problems in conducting a duration gap analysis is that the duration gap is calculated ass Post by: valputin on Nov 28, 2015 One of the problems in conducting a duration gap analysis is that the duration gap is calculated assuming that interest rates for all maturities are the same. That means that the yield curve is
A) slightly upward sloping. B) steeply upward sloping. C) flat. D) downward sloping. Title: Re: One of the problems in conducting a duration gap analysis is that the duration gap is calculated Post by: Meela on Dec 6, 2015 Content hidden
Title: Re: One of the problems in conducting a duration gap analysis is that the duration gap is calculated ass Post by: valputin on Dec 14, 2015 Thank you
Title: Re: One of the problems in conducting a duration gap analysis is that the duration gap is calculated ass Post by: Meela on Dec 14, 2015 @valputin,
Happy to help :) |