Biology Forums - Study Force

Other Fields Homework Help Management Topic started by: Louie928 on Dec 14, 2015



Title: Systems for monitoring the project's scope, schedule, and costs during the design stage fall under t
Post by: Louie928 on Dec 14, 2015
Systems for monitoring the project's scope, schedule, and costs during the design stage fall under the heading of:
A) Design control.
B) Configuration control.
C) Specification control.
D) Acquisition control.


Title: Re: Systems for monitoring the project's scope, schedule, and costs during the design stage fall und
Post by: flammable on Dec 16, 2015
Content hidden


Title: Re: Systems for monitoring the project's scope, schedule, and costs during the design stage fall under t
Post by: Louie928 on Dec 21, 2015
Excellent, thx


Title: Re: Systems for monitoring the project's scope, schedule, and costs during the design stage fall under t
Post by: flammable on Dec 25, 2015
Good luck with the rest, Louie928