Title: When errors have been made while producing a product such that the item must be discarded, the ... Post by: silverbullet on Oct 29, 2016 When errors have been made while producing a product such that the item must be discarded, the resultant cost is called a(n):
A) yield loss. B) external failure cost. C) warranty. D) rework cost. Title: Re: When errors have been made while producing a product such that the item must be discarded, the ... Post by: GL700Wing on Nov 21, 2016 Content hidden
Title: Re: When errors have been made while producing a product such that the item must be discarded, the ... Post by: silverbullet on Dec 18, 2016 thanks for being so helpful
|