Title: Consider the following Activity-On-Node (AON) PERT project. The three values that represent each ... Post by: pd_master on Apr 16, 2017 Consider the following Activity-On-Node (AON) PERT project. The three values that represent each activity's completion time (in days) correspond to an optimistic time, most likely time, and pessimistic time, respectively. What is the probability of completing the project within 18 days?
a. 0.0668 b. 0.4332 c. 0.9332 d. 0.4878 e. 0.0122 Title: Re: Consider the following Activity-On-Node (AON) PERT project. The three values that represent ... Post by: MadMary on Apr 16, 2017 Content hidden
Title: Re: Consider the following Activity-On-Node (AON) PERT project. The three values that represent each ... Post by: pd_master on Jun 13, 2017 Thank you!
|