Title: If the Cpk index exceeds 1:
Post by: sinnefoula on Jul 12, 2017
If the Cpk index exceeds 1:
A) the x-bar chart must indicate that the process is in control.
B) the process is capable of Six Sigma quality.
C) σ must be less than one-third of the absolute value of the difference between each specification limit and the process mean.
D) the process is characterized as "not capable."
E) the AQL must be smaller than the LTPD.