Title: Value analysis takes place: (Multiple Choice) Post by: Apatix on Jul 13, 2017 Value analysis takes place:
A) during the initial stages of production when something needs to be done to assure product success. B) when the product is first conceived. C) when the product is selected and designed. D) when the product cost is very low. E) during the production process when it is clear that the new product is a success. Title: Re: Value analysis takes place: Post by: Almeyric on Jul 13, 2017 Content hidden
Title: Re: Value analysis takes place: Post by: Apatix on Sep 21, 2017 I can't thank you enough
|