Title: When installing an exposed grid ceiling system, the first component to be installed is the _____. ...
Post by: bekah02 on Mar 16, 2018
When installing an exposed grid ceiling system, the first component to be installed is the _____.
 
  a. main runners
  b. hanger inserts and wires
  c. cross runners (tees)
  d. wall angle

 Q. 2

When using a recovery device manufactured after November 15, 1993, the recovery level for Type I appliances is:
 
  A) 80 of the system charge if the compressor is non-operational, 90 if the compressor is operational.
  B) 80 of the system charge if the compressor is operational, 90 if the compressor is non-operational.
  C) 0 psig.
  D) 80 of the system charge.


Title: When installing an exposed grid ceiling system, the first component to be installed is the _____. ...
Post by: 吳家良 on Mar 16, 2018
Content hidden


Title: When installing an exposed grid ceiling system, the first component to be installed is the _____. ...
Post by: bekah02 on Mar 16, 2018
Wow! Thanks you for this correct set of answers, wasn't expecting it...


Title: When installing an exposed grid ceiling system, the first component to be installed is the _____. ...
Post by: 吳家良 on Mar 16, 2018
My pleasure!