Title: Design/build means that (Multiple Choice)
Post by: supernumerary on Mar 16, 2018
Design/build means that
 
  a. One company is responsible for both design and construction
  b. Construction begins before design is complete
  c. The project is technically complex
  d. Both A and B

 Q. 2

Which of the following is true of a GMP contract?
 
  a. GMP is the same as a lump sum bid
  b. The contractor passes all costs to the owner up to a predetermined maximum
  c. The owner assumes all project risk
  d. The construction manager assumes all project risk
  e. None of the above


Title: Design/build means that (Multiple Choice)
Post by: kaefol on Mar 16, 2018
Ans. to #1

A

Ans. to #2

B


Title: Design/build means that (Multiple Choice)
Post by: supernumerary on Mar 16, 2018
found this very helpful thank you