Title: If the results of tests of controls support the design and operations of controls as expected, the ... Post by: bmwprincess on Aug 1, 2022 If the results of tests of controls support the design and operations of controls as expected, the auditor uses ________ control risk as the preliminary assessment.
▸ a lower ▸ the same ▸ a higher ▸ either a lower or higher Title: If the results of tests of controls support the design and operations of controls as expected, the ... Post by: Aquarius1 on Aug 1, 2022 Content hidden
|