Title: Assume that activity cost is $93,000, predetermined total overhead is $120,000, actual overhead is ... Post by: BrandyBraden on Jan 29, 2023 Assume that activity cost is $93,000, predetermined total overhead is $120,000, actual overhead is $98,000, and the company has three product lines, the activity rate is
▸ $50,000 per product line. ▸ $31,000 per product line. ▸ $40,000 per product line. ▸ $32,667 per product line. Title: Assume that activity cost is $93,000, predetermined total overhead is $120,000, actual overhead is ... Post by: ramos1992 on Jan 29, 2023 Content hidden
|