Biology Forums - Study Force

Science-Related Homework Help High School Level Science Topic started by: jrah on Mar 24, 2023



Title: Charlie lifts a box with a force of 500 N and sets it on a table top 1.2 m above its starting ...
Post by: jrah on Mar 24, 2023
Charlie lifts a box with a force of 500 N and sets it on a table top 1.2 m above its starting position. Lauren pushes an identical box up a 5 m ramp from the floor to the top of the same table. Which person did more work?

a
Lauren did more work.
 b
The size of each girl needs to be known to find the answer.
 c
Charlie and Lauren did the same amount of work.
 d
Charlie did more work.


Title: Re: Charlie lifts a box with a force of 500 N and sets it on a table top 1.2 m above its starting ...
Post by: brog0311 on Mar 24, 2023
To determine the work done by each person, we need to calculate the amount of work done by the force applied and the distance moved.

For Charlie, the work done is:
Work = force x distance = 500 N x 1.2 m = 600 J

For Lauren, the work done is:
Work = force x distance = weight x height = (500 N) x (5 m) = 2500 J

Therefore, Lauren did more work than Charlie. The answer is option a) Lauren did more work.