Title: Teasley Corporation uses a job-order costing system with a single plantwide predetermined overhead ... Post by: onetouch on Mar 26, 2023 Teasley Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on 70,000 machine-hours, total fixed manufacturing overhead cost of $630,000, and a variable manufacturing overhead rate of $3.40 per machine-hour. Job X159 was recently completed. The job cost sheet for the job contained the following data:
Required: Calculate the total job cost for Job X159. Title: Re: Teasley Corporation uses a job-order costing system with a single plantwide predetermined overhead ... Post by: ecunis1 on Mar 26, 2023 Content hidden
|