Title: Placker Corporation uses a job-order costing system with a single plantwide predetermined overhead ...
Post by: Victoria87 on Mar 26, 2023

Placker Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $155,000, variable manufacturing overhead of $3.40 per machine-hour, and 50,000 machine-hours. Recently, Job A881 was completed with the following characteristics:

Total machine-hours100
Direct materials$ 645
Direct labor cost$ 2,300

The total job cost for Job A881 is closest to: (Round your intermediate calculations to 2 decimal places.)



▸ $3,595

▸ $2,945

▸ $2,950

▸ $1,295