Title: Sargent Corporation applies overhead cost to jobs on the basis of 90% of direct labor cost. If Job ... Post by: gslwong on Mar 26, 2023 Sargent Corporation applies overhead cost to jobs on the basis of 90% of direct labor cost. If Job 210 shows $22,860 of manufacturing overhead cost applied, how much was the direct labor cost on the job?
▸ $25,400 ▸ $43,434 ▸ $20,574 ▸ $22,860 Title: Re: Sargent Corporation applies overhead cost to jobs on the basis of 90% of direct labor cost. If Job ... Post by: juniorp on Mar 26, 2023 Content hidden
|