Title: Which of the following is the correct formula to compute the predetermined overhead rate?
Post by: billafin on Mar 26, 2023

Which of the following is the correct formula to compute the predetermined overhead rate?



▸ Predetermined overhead rate = Estimated total units in the allocation base ÷ Estimated total manufacturing overhead costs

▸ Predetermined overhead rate = Estimated total manufacturing overhead costs ÷ Estimated total units in the allocation base

▸ Predetermined overhead rate = Actual total manufacturing overhead costs ÷ Estimated total units in the allocation base

▸ Predetermined overhead rate = Estimated total manufacturing overhead costs ÷ Actual total units in the allocation base.