Title: With a step fixed-cost function ________. Post by: jerico on Mar 13, 2015 With a step fixed-cost function ________.
A) the cost varies with the changes in the activity B) fixed cost is often approximated with a continuous variable-cost function C) fixed cost changes proportionally with the level of activity D) the cost remains the same over wide ranges of the activity in each relevant range Title: Re: With a step fixed-cost function ________. Post by: cyborg on Mar 19, 2015 Content hidden
Title: Re: With a step fixed-cost function ________. Post by: jerico on Mar 23, 2015 This solved my problem perfectly, thank you for your kind input.
Title: Re: With a step fixed-cost function ________. Post by: cyborg on Mar 23, 2015 Sweet, you're welcome.
|