Title: Engineered costs ________. (Multiple Choice) Post by: jerico on Mar 14, 2015 Engineered costs ________.
A) have a no repetitive relationship with output B) have no measurable cause-and-effect relationship between output and resources used C) include research and development and human resource costs D) include a high level of certainty Title: Re: Engineered costs ________. (Multiple Choice) Post by: cyborg on Mar 19, 2015 Content hidden
Title: Re: Engineered costs ________. (Multiple Choice) Post by: jerico on Mar 23, 2015 I can confidently say that it looks and sounds right lol Thank you :) Give this man a thumbs up.
Title: Re: Engineered costs ________. (Multiple Choice) Post by: cyborg on Mar 23, 2015 Cool! No problem.
|