Title: The ________ is a priority-sequencing rule that is calculated by dividing the time remaining until a ... Post by: silverbullet on Oct 29, 2016 The ________ is a priority-sequencing rule that is calculated by dividing the time remaining until a job's due date by the total shop time remaining for the job, including the setup, processing, move, and expected waiting times of all remaining operations, including the operation being scheduled.
Title: Re: The ________ is a priority-sequencing rule that is calculated by dividing the time remaining ... Post by: GL700Wing on Nov 21, 2016 Content hidden
Title: Re: The ________ is a priority-sequencing rule that is calculated by dividing the time remaining until a ... Post by: silverbullet on Dec 18, 2016 needed this today
thanks so much |