Title: The specific term for assigning direct costs is: Post by: skully on Feb 12, 2017 The specific term for assigning direct costs is:
A) cost pool. B) cost tracing. C) cost assignment. D) job-costing system. E) cost allocation base. Title: Re: The specific term for assigning direct costs is: Post by: lordington on Feb 12, 2017 Content hidden
Title: Re: The specific term for assigning direct costs is: Post by: skully on Apr 7, 2017 Thank you ever so much for this generous answer.
|