Title: Which of the following is not a level in the cost hierarchy? Post by: skully on Feb 12, 2017 Which of the following is not a level in the cost hierarchy?
A) Batch-level costs. B) Input-level unit costs. C) Output-unit level costs. D) Product-sustaining costs. E) Facility-sustaining costs. Title: Re: Which of the following is not a level in the cost hierarchy? Post by: noitulove on Feb 12, 2017 Content hidden
Title: Re: Which of the following is not a level in the cost hierarchy? Post by: skully on Apr 7, 2017 Thank you for answering correctly
|