× Didn't find what you were looking for? Ask a question
  
  
Top Posters
Since Sunday
p
57
54
C
18
I
13
n
13
a
12
11
C
11
s
11
11
m
11
10
New Topic  
wrote...
Valued Member
Posts: 404
2 weeks ago Edited: 2 weeks ago, prashantakerkar
https://en.wikipedia.org/wiki/Express_train

https://www.google.com/search?tbm=isch&source=hp&ei=7zVvXd-YC8rgvgSMkqrIDA&q=express+train&oq=express+train&gs_l=mobile-gws-wiz-img.12..0l5.1811.6683..7370...0.0..0.171.1611.0j12......0....1.......0.gNsN3bhmmds

Is it possible to design & construct Swimming pool in Express train coach or coaches?

Thanks & Regards,
Prashant S Akerkar
Attached file
Thumbnail(s):
You must login or register to gain access to this attachment.
Read 243 times
11 Replies

Related Topics

Replies
wrote...
Educator
2 weeks ago
I think the water would sway too much while the train is operating, thereby preventing the swimmer from enjoy their swim. For novices, it could even be hazardous, cause people to drown. Bad idea overall, hence why it's never been attempted, but only in cartoons Grinning Face Grinning Face with Smiling Eyes

The best way to say thank you is with a positive review:

  Click here to review us!

Your support goes a long way!
wrote...
Valued Member
2 weeks ago Edited: 2 weeks ago, prashantakerkar
Thanks.

So it is technically not feasible (Difficult) to implement Swimming pool in Long distance trains ?

The water will / may come out from the swimming pool as the Express train is running at full speed ?

The water coming out of the swimming pool cannot be avoided?

Say a 6 feet deep  swimming pool to be designed & constructed in Express train as a business case.

Thanks & Regards,
Prashant S Akerkar
wrote...
Valued Member
2 weeks ago
Thanks.

Depending upon the dimensions of the dedicated coach for Swimming pool, Can we also
have two swimming pools in the Express train?

1 Swimming pool  -  5 feet deep
1 Swimming pool  -  6 feet deep

This could be a interesting Swimming pool construction project in dedicated Coach for implementation in Express train.

Charges will be beared by the passengers on board of the Express train to avail the facility of the Swimming pool.

Thanks & Regards,
Prashant S Akerkar
wrote...
Valued Member
2 weeks ago Edited: 2 weeks ago, prashantakerkar
Thanks.

Reference :

https://www.google.com/search?ei=7JZvXb2RDsTWz7sP3sWm8AU&q=swimming+pool+construction+process&oq=swimming+pool+construction+process&gs_l=mobile-gws-wiz-serp.12..0i71l5.0.0..20686...0.1..0.0.0.......0.S44CaCvZ2f4

Thanks & Regards,
Prashant S Akerkar
Attached file
Thumbnail(s):
You must login or register to gain access to this attachment.
wrote...
Educator
2 weeks ago
So it is technically not feasible (Difficult) to implement Swimming pool in Long distance trains ?

The water will / may come out from the swimming pool as the Express train is running at full speed ?

Easy to implement, but to your second question, that's the main logistical issue. Water always takes on the form of its container. If the train accelerates, the water will be pushed to one side of the bed. Whether it's 5 or 6 feet, the difference is so little, it doesn't matter. Look at how violent water waves get on windy days; now imagine that speed created by a train. Furthermore, water weight is very heavy; carrying all that weight means bigger engines, and bigger engines means more fuel. The idea is flawed.

The best way to say thank you is with a positive review:

  Click here to review us!

Your support goes a long way!
wrote...
Valued Member
2 weeks ago

Thanks.

As you mention, Robust built Train engines can assist in this regard.

https://en.wikipedia.org/wiki/List_of_largest_locomotives

This can be implemented in Large Locomotives for testing purposes ?

Thanks & Regards,
Prashant S Akerkar

wrote...
Educator
2 weeks ago
Most of these are used for freight. Passenger trains don't use these, do they?
The best way to say thank you is with a positive review:

  Click here to review us!

Your support goes a long way!
wrote...
Valued Member
2 weeks ago
Thanks.

You are right. I feel those Large Locomotives are used for Freight transportation purposes and not for passengers.

Thanks & Regards,
Prashant S Akerkar
wrote...
Valued Member
A week ago Edited: A week ago, prashantakerkar
Thanks.

This could be a interesting project for implementation on Express train coach/es.

Red or Blue colour Text painted "Swimming pool" on the exterior of the coach/es of Express train to identify that this are dedicated coaches for Swimming pools.

Thanks & Regards,
Prashant S Akerkar
wrote...
Educator
A week ago
Most train trips don't exceed 45 minutes, not sure if passengers would be encouraged to swim within that short timeframe. Thinking Face
The best way to say thank you is with a positive review:

  Click here to review us!

Your support goes a long way!
wrote...
Valued Member
A week ago
Thanks.

The Swimming pool dimensions layouts drawing plans inside the coaches of Express Trains can be created by Architects.

Thanks & Regards,
Prashant S Akerkar
New Topic      
Explore
Post your homework questions and get free online help from our incredible volunteers.
Learn More
Improve Grades
Help Others
Save Time
Accessible 24/7
  108 People Browsing
Your Opinion

Previous poll results: Where do you get your textbooks?
Related Images
 773
 129
 107