What are the areas of performance in which buildings can earn LEED points?
A) Design, construction, maintenance, and operation
B) Design, water, energy, materials, and maintenance
C) Site, water, energy, materials, and indoor environment
D) Planning, construction, and operation
[Ques. 2] When first setting up a new communicating control system:
A) The technician enters the control code on each individual component access screen.
B) The system automatically scans the network for connected devices.
C) The technician must enter the communicating address and function of each component in the system.
D) The technician must connect a laptop to each device in the network.
[Ques. 3] How much time should it take the ft3 to turn per revolution if a furnace is using 142.8 ft/hr3 of gas?
A) 25.2 seconds per revolution B) 12.6 seconds per revolution
C) 50.4 seconds per revolution D) 52.4 seconds per revolution
[Ques. 4] Select the characteristics of a whole-house dehumidifier. You may choose more than one.
A) Must sit in the room being conditioned
B) Can provide high-efficiency air filtration
C) Can provide outside ventilation
D) Connects to duct system
E) Does not require a drain
[Ques. 5] A hot compressor with an infinite ohms reading between common and the other two terminals and a reading of 4.3 between the start and run terminals most likely has:
A) An open common winding. B) An open start winding.
C) A shorted run winding. D) An open internal overload.