________ is a process in which stakeholders identify the features that a project will need and then prioritize them as mandatory, preferred, or nonessential.
A) Requirements analysis
B) Informative modeling
C) Acceptance testing
D) Feasibility study
Q. 2Which of the following is most closely associated with sustaining technologies?
A) improvements that streamline existing processes
B) radical breakthrough that replaces low-end products
C) potential to reshape and reform an industry
D) association with new product or service, led by technology
Q. 3A number used to encrypt data is called a(n) ________.
A) signature
B) key
C) cookie
D) escrow
Q. 4E-marketing information systems provide extensive tracking capabilities by embedding in the HTML email a ________.
A) web trojan
B) web beacon
C) server log
D) web log
Q. 5Structured information can be defined as data ________.
A) that can be organized into hierarchies
B) that cannot be linked together
C) about data that clarifies the nature of the information
D) that is difficult to break down
Q. 6To balance the information needs of multiple stakeholders, top-level managers need clear, consistent, and accurate reports that summarize information from across the enterprise.
Indicate whether the statement is true or false
Q. 7Which of the following illustrates a sustaining technology?
A) Digital cameras replaced cameras that required film.
B) Digital music sold over the Internet disallowed simultaneous downloads.
C) LCD monitors were introduced to replace analog monitors.
D) Car manufacturers invented airbags to improve safety of passengers.