Material Requirements Planning (MRP) operates on a component product level which is the level _____________ also operates at. (1). Component/Supplier Capacity Planning (SCP) (2). Sub-assembly/Input/Output Analysis (3). Raw material/Supply Chain Planning (4). Component/Resource Capacity Planning
 a. (1) c. (3)
  b. (2) or (4) d. None of the above