Top Posters
Since Sunday
5
a
5
k
5
c
5
B
5
l
5
C
4
s
4
a
4
t
4
i
4
r
4
New Topic  
islandgurl islandgurl
wrote...
Posts: 142
Rep: 0 0
A year ago

Hultquist Corporation has two manufacturing departments--Forming and Customizing. The company used the following data at the beginning of the period to calculate predetermined overhead rates:

FormingCustomizingTotal
Estimated total machine-hours (MHs)9,0001,00010,000
Estimated total fixed manufacturing overhead cost$50,400$2,600$53,000
Estimated variable manufacturing overhead cost per MH$ 1.70$ 2.10

During the period, the company started and completed two jobs--Job C and Job L. Data concerning those two jobs follow:

Job CJob L
Direct materials$ 15,100$ 6,900
Direct labor cost$ 20,800$ 8,500
Forming machine-hours6,1002,900
Customizing machine-hours400600

Required:

a. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate that overhead rate. (Round your answer to 2 decimal places.)

b. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate the amount of manufacturing overhead applied to Job L. (Do not round intermediate calculations.)

c. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate the total manufacturing cost assigned to Job L. (Do not round intermediate calculations.)

d. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours and uses a markup of 80% on manufacturing cost to establish selling prices. Calculate the selling price for Job L. (Do not round intermediate calculations.)

e. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. What is the departmental predetermined overhead rate in the Forming department? (Round your answer to 2 decimal places.)

f. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. What is the departmental predetermined overhead rate in the Customizing department? (Round your answer to 2 decimal places.)

g. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. How much manufacturing overhead will be applied to Job L? (Do not round intermediate calculations.)

h. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. Further assume that the company uses a markup of 80% on manufacturing cost to establish selling prices. Calculate the selling price for Job L. (Do not round intermediate calculations.)

Textbook 
Introduction to Managerial Accounting: Brewer Edition: 9e

Introduction to Managerial Accounting: Brewer Edition: 9e


Edition: 9th
Authors:
Read 27 times
1 Reply
Replies
Answer verified by a subject expert
Gimor1220Gimor1220
wrote...
Posts: 154
Rep: 0 0
A year ago
Sign in or Sign up in seconds to unlock everything for free
More solutions for this book are available here
This verified answer contains over 1500 words.
1

Related Topics

islandgurl Author
wrote...

A year ago
Correct Slight Smile TY
wrote...

Yesterday
Just got PERFECT on my quiz
wrote...

2 hours ago
Thanks
New Topic      
Explore
Post your homework questions and get free online help from our incredible volunteers
  1341 People Browsing
Related Images
  
 51
  
 193
  
 418
Your Opinion
Do you believe in global warming?
Votes: 370

Previous poll results: Where do you get your textbooks?