Top Posters
Since Sunday
g
2
2
New Topic  
vnaust vnaust
wrote...
Posts: 145
Rep: 0 0
2 years ago

Bierce Corporation has two manufacturing departments--Machining and Finishing. The company used the following data at the beginning of the year to calculate predetermined overhead rates:

MachiningFinishingTotal
Estimated total machine-hours (MHs)6,0005,00011,000
Estimated total fixed manufacturing overhead cost$5,100$39,200$44,300
Estimated variable manufacturing overhead cost per MH$ 1.40$ 2.00

During the most recent month, the company started and completed two jobs--Job B and Job K. There were no beginning inventories. Data concerning those two jobs follow:

Job BJob K
Direct materials$ 22,300$ 7,900
Direct labor cost$ 24,700$ 2,500
Machining machine-hours4,0002,000
Finishing machine-hours1,0004,000

Required:

a. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate that overhead rate. (Round your answer to 2 decimal places.)

b. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate the amount of manufacturing overhead applied to Job B. (Do not round intermediate calculations.)

c. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate the amount of manufacturing overhead applied to Job K. (Do not round intermediate calculations. Round your answer to the nearest whole dollar amount.)

d. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. What is the departmental predetermined overhead rate in the Machining department? (Round your answer to 2 decimal places.)

e. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. What is the departmental predetermined overhead rate in the Finishing department? (Round your answer to 2 decimal places.)

f. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. How much manufacturing overhead will be applied to Job B? (Do not round intermediate calculations.)

g. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. How much manufacturing overhead will be applied to Job K? (Do not round intermediate calculations.)

Textbook 
Introduction to Managerial Accounting: Brewer Edition: 9e

Introduction to Managerial Accounting: Brewer Edition: 9e


Edition: 9th
Authors:
Read 65 times
1 Reply
Replies
Answer verified by a subject expert
starikovsstarikovs
wrote...
Posts: 151
Rep: 0 0
2 years ago
Sign in or Sign up in seconds to unlock everything for free
More solutions for this book are available here
This verified answer contains over 1180 words.
1

Related Topics

vnaust Author
wrote...

2 years ago
Smart ... Thanks!
wrote...

Yesterday
This calls for a celebration Person Raising Both Hands in Celebration
wrote...

2 hours ago
You make an excellent tutor!
New Topic      
Explore
Post your homework questions and get free online help from our incredible volunteers
  965 People Browsing
Related Images
  
 370
  
 390
  
 296
Your Opinion
Which country would you like to visit for its food?
Votes: 895

Previous poll results: How often do you eat-out per week?